Main Ground Combat System (MGCS) and the participation of Greek company


SI VIS PACEM, PARA BELLUM Il “Main Ground Combat System” europeo

Main Ground Combat System (MGCS) The Main Ground Combat System (MGCS) is a joint project between Germany and France to develop a new generation of main battle tanks and other land warfare systems to replace their current Leopard 2 and Leclerc tanks. The MGCS is expected to be operational by 2035 and to be the backbone of the European land forces.


Study Unofficial Main Ground Combat System (December Update) YouTube

PARIS --- On September 22, Paris and Berlin gave new impetus to the MGCS, their Main Ground Combat System. The result of a collaboration between France and Germany, this major military project aims to revolutionize the landscape of battle tanks and land combat by 2040-2045.


Main Ground Combat System (MGCS) and Euro Main Battle Tank (EMBT

Initiated in 2017 alongside the Future Air Combat System (SCAF), the MGCS is a Franco-German armament program. It aims to replace the German Leopard 2 tanks and the French Leclerc tanks while incorporating the latest technological advancements. More than just a traditional heavy armored vehicle, the MGCS is conceived as a multi-platform system: a main battle tank equipped with a large-caliber.


Main Ground Combat System (MGCS) and the participation of Greek company

The Main Ground Combat System (MGCS) is a project launched in 2017 by Germany and France, aiming to replace their current Leopard 2 and Leclerc main battle tanks. Coordinated by Germany, in contrast to the other major Franco-German program launched in 2018 (the Future Combat Air System implemented under French lead), the MGCS will not be a single armoured fighting vehicle but a series of.


France and Germany agree on new Main Ground Combat System (MGCS) MBT

News. 04 May 2020. The Ministry of Defence of Germany announced on 28 th April 2020 the signature of two agreements with France for the joint development of a Main Battle Tank (MBT), the Main Ground Combat System (MGCS). Announced in 2012, the project aims at replacing the ageing German Leopard 2 and French Leclerc by the mid-2030s.


MGCS The Smart Tank is Rolling in & HENSOLDT

Representing next-generation technology, the weapon system - provisionally designated the 'Main Ground Combat System' (MGCS) - will constitute a quantum leap in both offensive and defensive capabilities. The decision to develop MGCS reflects the fact that battlefield threats to even the heaviest main battle tanks (MBTs) are growing.


Italy Might Join French German Main Ground Combat System (MGCS) Project

The ambitious Franco-German MGCS (Main Ground Combat System) project is the ground combat system of the future. It will come into service between 2030 and 2040 and will continue to support ground forces in subsequent decades, serving as their main combat system. The system's requirements are one of the major challenges facing its.


Project Mobile Ground Combat System. New tanks for France and Germany

The Main Ground Combat System. In 2019, Germany and France agreed to work together on a future ground combat system called the Main Ground Combat System (MGCS). Rheinmetall, one of Europe's leading suppliers of armoured vehicles such as the LEOPARD MBT, MBT Advanced Technology Demonstrator LYNX IFV, KODIAK Armoured Engineer Vehicle and the.


Rheinmetall'?s future tank. Main Ground Combat System (MGCS).

Italy, the Netherlands and "many others" expressed an interest in joining the project to develop the Main Ground Combat System, or MGCS, German Defense Minister Boris Pistorius said at a press.


Hensoldt vision for MGCS Main Ground Combat System Defense News

Britain's interest in the Main Ground Combat System has all the markings of a test case for pursuing large-scale, joint programs in a post-Brexit Europe.


The Dead District French vision for the MGCS Future european Combat

The Program Executive Office-Ground Combat System (PEO GCS) serves as the "System of Systems Integrator" of the ground combat systems for the armed forces and leads Army transformation ef-forts toward future systems while main-taining a current combat-ready force. PEO GCS is a command partner in the TACOM Life Cycle Management Command.


Rheinmetall'?s future tank. Main Ground Combat System (MGCS).

As part of a ground-breaking project, Germany and France are working together on a state-of-the-art tank system given the unassuming title of Main Ground Combat System (MGCS). It is set to replace the current Leopard 2 and Leclerc main battle tanks (MBT). HENSOLDT has identified the MGCS as a major strategic programme and will develop the key.


Main Ground Combat System (MGCS) and Euro Main Battle Tank (EMBT

Introduction. In September last year, Paris and Berlin joined forces to breathe new life into the MGCS, or the Main Ground Combat System. This ambitious project, a product of French-German collaboration, seeks to redefine the landscape of tank warfare and ground combat, with its implementation expected between 2040 and 2045.


Main Ground Combat System (MGCS) and Euro Main Battle Tank (EMBT

MGCS (Main Ground Combat System) is a project by France and Germany for a new state-of-the-art tank. HENSOLDT strives to develop the game-changing networked sensor solution for MGCS. The goal: Offering the crew an automated situation analysis in real time with the support of AI.


Main Ground Combat System (MGCS) and Euro Main Battle Tank (EMBT

The MGCS goes well beyond a purely linear continuation of existing main battle tank capabilities. A multiplatform concept is favored, and the MGCS may involve both manned and unmanned ground vehicles as well as unmanned aerial vehicles (UAVs). Deliveries are expected to commence by 2035, with initial operational capability expected in 2040.


Main Ground Combat System Concept by CNCH on DeviantArt

Main Ground Combat System (also called Leopard 3) is a project by France and Germany since 2012 to replace their currently deployed AMX Leclerc and Leopard 2 main battle tanks (MBTs). In 2016, the program was in the concept phase which was projected to be completed by 2017. A precondition for the new tank is the development of a new main cannon.

Scroll to Top